SUPPLY OF LABOR AND INSTALLATION OF ADDITIONAL CCTV OF SILANE LOADING & UNLOADING AREA
REPLACEMENT OF AUTOMATIC SLIDING DOOR IN FILING ROOM
INSTALLATION OF CCTV AT COMPRESSOR AREA 1
INSTALLATION OF CCTV AT COMPRESSOR AREA 2
INSTALLATION OF FIRE PROTECTION SYSTEM FOR EMPTY DRUM STORAGE
INSTALLATION OF POWER & LIGHTING SYSTEM FOR EMPTY DRUM STORAGE
SLM AND EQUIPMENT FOR THE RENOVATION OF CTM TACLOBAN
SUPPLY, LABOR AND MATERIALS FOR THE RENOVATION OF CTM TACLOBAN
INSTALLATION OF FDAS FOR CALAPAN
INSTALLATION OF LIGHTING & POWER FOR CALAPAN
INSTALLATION OF LOUVER
INSTALLATION OF SIGNAGE
REPAIR OF BLENDER SIDINGS & CEILING
PROJECT STAIRWAY – FABRICATION AND INSTALLATION OF ACCESS STAIRWAY
CTM CALAPAN FDAS
EMERGENCY CANAL CLEANING ALONG ROAD 2
SUPPLY AND INSTALLATION OF WHITE SCREEN
FLOOR MOUNTED AC INSTALLATION
SUPPLY & EXHAUST DUCTING FOR FLAVOR KITCHEN
SUPPLY OF LABOR AND MATERIALS FOR THE FABRICATION AND INSTALLATION OF CABLE SAG SUPPORT POST
RESTORATION OF CANOPY WALL
GLASS DOOR AT FLAVORS, TOL ADMIN
ADDITIONAL SCOPE FOR ACCENTURE FIT OUT PROJECT
FITOUT PROJECT ACCENTURE SPACE 25
INSTALLATION ADMIN SECURITY BUILDING POWER & LIGHTING LAYOUT
INSTALLATION OF LIGHTING POLE LAYOUT
INSTALLATION OF TROFFER LIGHTING FIXTURE
INSTALLATION FIRE STATION LIGHTING LAYOUT MECHANICAL
ADMIN BUILDING INSTALLATION OF PIPE SUPPORT LAYOUT
ADMIN BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM
CONTROL BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM
FIRE STATION INSTALLATION OF FIRE PROTECTION SYSTEM
ADMIN SECURITY BUILDING HVAC
ADMIN BUILDING CONCRETE PAD
ADMIN BUILDING OUTDOOR UNIT BRACKET
INSTALLATION OF PACU & ACCU FLOOR MOUNTED SUPPORT
INSTALLATION ADMIN SECURITY BUILDING POWER & LIGHTING LAYOUT
INSTALLATION OF LIGHTING POLE LAYOUT
INSTALLATION OF TROFFER LIGHTING FIXTURE
INSTALLATION FIRE STATION LIGHTING LAYOUT MECHANICAL
ADMIN BUILDING INSTALLATION OF PIPE SUPPORT LAYOUT
ADMIN BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM
CONTROL BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM
FIRE STATION INSTALLATION OF FIRE PROTECTION SYSTEM
ADMIN SECURITY BUILDING HVAC
ADMIN BUILDING CONCRETE PAD
ADMIN BUILDING OUTDOOR UNIT BRACKET
INSTALLATION OF PACU & ACCU FLOOR MOUNTED SUPPORT
INSTALLATION OF FIRE PROTECTION SYSTEM
INSTALLATION OF CRISTERN TANK AND PUMP RELOCATION
SLIM FOR THE CONSTRUCTION OF CUSTOM AND RELOCATION OF FIRE PUMP & ELECTRICAL WORKS
INSTALLATION OF BBF LINE 4 CO2 FIRE SUPPRESSION SYSTEM
INSTALLATION OF FIRE SUPPRESSION SYSTEM
WAREHOUSE AND STORE BUILDING
SUPPLY AND INSTALLATION OF CO2 TANK FOR FRYER
DEMOLITION AND RESTORATION OF BBF LINE 1
FIRE SPRINKLER RELOCATION AT BBF LINE 4
FIRE SUPPRESSION SYSTEM INCLUDING FABRIC
FIRE SUPPRESSION SYSTEM TRANSFER AT FRYER 1
PMS OF FIRE SUPPRESSION FOR LINE 1 & 2
REPLACEMENT OF TILES AT ADMIN LOBBY
SCREEN INSTALLATION AT CHARGE ROOM AND COMFORT ROOM
MAYO LAB AND ZUCALO
INSTALLATION OF SMOKE DETECTOR (CALAMBA)