Mechanical Services & Supply

  • INSTALLATION OF PERMITER FENCE
  • POWER SUPPLY AND DEDUSTING PIPE
  • INSTALLATION OF PNEUMATIC PIPING FOR MACHINE
  • SUPPLY AND INSTALLATION OF RESERVOIR AND PUMP PIPING LINE
  • SUPPLY AND INSTALLATION OF WATER SUPPLY PIPING AT FLAVOR KITCHEN

OPTODEV INC.​

  • INSTALLATION OF ADDITIONAL CAMERAS IN LOW INDEX
  • SUPPLY OF LABOR AND INSTALLATION OF ADDITIONAL CCTV OF SILANE LOADING & UNLOADING AREA

  • REPLACEMENT OF AUTOMATIC SLIDING DOOR IN FILING ROOM

  • INSTALLATION OF CCTV AT COMPRESSOR AREA 1

  • INSTALLATION OF CCTV AT COMPRESSOR AREA 2

  • INSTALLATION OF FIRE PROTECTION SYSTEM FOR EMPTY DRUM STORAGE

  • INSTALLATION OF POWER & LIGHTING SYSTEM FOR EMPTY DRUM STORAGE

Mariwasa (Calapan & Tacloban)

  • SLM AND EQUIPMENT FOR THE RENOVATION OF CTM TACLOBAN

  • SUPPLY, LABOR AND MATERIALS FOR THE RENOVATION OF CTM TACLOBAN

  • INSTALLATION OF FDAS FOR CALAPAN

  • INSTALLATION OF LIGHTING & POWER FOR CALAPAN

  • INSTALLATION OF LOUVER

  • INSTALLATION OF SIGNAGE

  • REPAIR OF BLENDER SIDINGS & CEILING

  • PROJECT STAIRWAY – FABRICATION AND INSTALLATION OF ACCESS STAIRWAY

  • CTM CALAPAN FDAS

  • EMERGENCY CANAL CLEANING ALONG ROAD 2

Edward Keller Philippines Inc.

  • SUPPLY AND INSTALLATION OF WHITE SCREEN

  • FLOOR MOUNTED AC INSTALLATION

  • SUPPLY & EXHAUST DUCTING FOR FLAVOR KITCHEN

  • SUPPLY OF LABOR AND MATERIALS FOR THE FABRICATION AND INSTALLATION OF CABLE SAG  SUPPORT POST

  • RESTORATION OF CANOPY WALL

  • GLASS DOOR AT FLAVORS, TOL ADMIN

  • ADDITIONAL SCOPE FOR ACCENTURE FIT OUT PROJECT

  • FITOUT PROJECT ACCENTURE SPACE 25

Ilijan Import Facility

ELECTRICAL

  • INSTALLATION ADMIN SECURITY BUILDING POWER & LIGHTING LAYOUT

  • INSTALLATION OF LIGHTING POLE LAYOUT

  • INSTALLATION OF TROFFER LIGHTING FIXTURE

  • INSTALLATION FIRE STATION LIGHTING LAYOUT MECHANICAL

  • ADMIN BUILDING INSTALLATION OF PIPE SUPPORT LAYOUT

  • ADMIN BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM

  • CONTROL BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM

  • FIRE STATION INSTALLATION OF FIRE PROTECTION SYSTEM

HVAC

  • ADMIN SECURITY BUILDING HVAC

  • ADMIN BUILDING CONCRETE PAD

  • ADMIN BUILDING OUTDOOR UNIT BRACKET

  • INSTALLATION OF PACU & ACCU FLOOR MOUNTED SUPPORT

Sta. Clara International Corp.

ELECTRICAL

  • INSTALLATION ADMIN SECURITY BUILDING POWER & LIGHTING LAYOUT

  • INSTALLATION OF LIGHTING POLE LAYOUT

  • INSTALLATION OF TROFFER LIGHTING FIXTURE

  • INSTALLATION FIRE STATION LIGHTING LAYOUT MECHANICAL

  • ADMIN BUILDING INSTALLATION OF PIPE SUPPORT LAYOUT

  • ADMIN BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM

  • CONTROL BUILDING INSTALLATION OF FIRE PROTECTION SYSTEM

  • FIRE STATION INSTALLATION OF FIRE PROTECTION SYSTEM

HVAC

  • ADMIN SECURITY BUILDING HVAC

  • ADMIN BUILDING CONCRETE PAD

  • ADMIN BUILDING OUTDOOR UNIT BRACKET

  • INSTALLATION OF PACU & ACCU FLOOR MOUNTED SUPPORT

HVAC

  • INSTALLATION OF FIRE PROTECTION SYSTEM

Daiwa Seiko

  • INSTALLATION OF CRISTERN TANK AND PUMP RELOCATION

  • SLIM FOR THE CONSTRUCTION OF CUSTOM AND RELOCATION OF FIRE PUMP & ELECTRICAL WORKS

CDO Foodsphere

  • INSTALLATION OF BBF LINE 4 CO2 FIRE SUPPRESSION SYSTEM

  • INSTALLATION OF FIRE SUPPRESSION SYSTEM

  • WAREHOUSE AND STORE BUILDING

  • SUPPLY AND INSTALLATION OF CO2 TANK FOR FRYER

  • DEMOLITION AND RESTORATION OF BBF LINE 1

  • FIRE SPRINKLER RELOCATION AT BBF LINE 4

  • FIRE SUPPRESSION SYSTEM INCLUDING FABRIC

  • FIRE SUPPRESSION SYSTEM TRANSFER AT FRYER 1

  • PMS OF FIRE SUPPRESSION FOR LINE 1 & 2

  • REPLACEMENT OF TILES AT ADMIN LOBBY

  • SCREEN INSTALLATION AT CHARGE ROOM AND COMFORT ROOM

  • MAYO LAB AND ZUCALO

  • INSTALLATION OF SMOKE DETECTOR (CALAMBA)

Lima Estate

  • SUPPLY AND INSTALLATION OF CCTV AND FDAS AT FITOUT LIPA
  • SUPPLY AND INSTALLATION OF WHITE SCREEN
  • FLOOR MOUNTED AC INSTALLATION
  • SUPPLY & EXHAUST DUCTING FOR FLAVOR KITCHEN
  • SUPPLY OF LABOR AND MATERIALS FOR THE FABRICATION AND INSTALLATION OF CABLE SAG SUPPORT POST
  • RESTORATION OF CANOPY WALL
  • GLASS DOOR AT FLAVORS, TOL ADMIN
  • ADDITIONAL SCOPE FOR ACCENTURE FIT OUT PROJECT
  • FITOUT PROJECT ACCENTURE SPACE
  • FITOUT PROJECT ACCENTURE SPACE (ELECTRICAL)
  • ELECTRICAL UPGRADE (ELECTRICAL DEFICIENCY)
  • AUTOMATIC FIRE SUPPRESSION SYSTEM (WET SPRINKLER) AT STARBUCKS
  • FENCE CONSTRUCTION PROJ. VARIATION 2
  • FLUSHING AT POWERHOUSE
  • LEX ADDITIONAL PARKING & PWD ACCESS RAMP (1)
  • LIMA SUPPLY & INSTALLATION OF LEX ADDITIONAL PARKING
  • PARAPHET PAINTING HIGH RISE
  • PIPE PRESSURE TEST INSPECTION REPORT (STARBUCKS)
  • PROVISION OF POWER SUPPLY STARBUCKS
  • SLM FOR REPAINTING_FABRICATION OF PICNIC TABLES AND BENCHES
  • INSTALLATION OF WATER TANK
  • WATER TANK ENCLOSURE